In order to eliminate age-related structural defects and to enhance the design of the building, the town hall was renovated in 2016. The installation of new thermal insulation and a new HANSA air conditioning system significantly reduced operating costs.
Area of application: Air conditioning of the hall area, the stands and the sanitary facilities
Installed devices: Various ventilation units, some of them in weatherproof design for roof mounting, control, some of them equipped with energy recovery systems.
Special features: All air conditioners are individually adapted to the place of use. All units are equipped with their own control system.